Load Management Program

Approximately 90% of the irrigation members participate in the load management program. This program is designed and closely controlled by senior management to shave the peak usage when power is the most expensive. A portion of these savings are passed on to irrigation members who are enrolled prior to April 1, by reducing the horsepower cost by $1.00/hp per month.

MEC's load management program has been in affect since 1984 and during load control situations is closely monitored by the General Manager, Assistant General Manager, Engineering Department, and the Power Plant. Simply put, "The more members that are signed up for the program the less it affects those members participating." There is no good reason that all of the irrigation accounts are not signed up. This is truly a win-win situation, which has no risk to the irrigation member.

Facts about Load Management

  • Program is only available for meters serving irrigation pumps.
  • Member must sign contract to get reduced horsepower cost from $2.00/hp to $1.00/hp.
  • Member must sign and deliver agreement to District Office on or before April 1. If member terminates agreement, the reduction of $1.00/hp/month must be paid back to the Cooperative.
  • System peak is directly related to the weather patterns which vary year to year.
  • Members are controlled not more than 3 hours at a time and not more than once per calendar day.
  • You can call toll free 1-877-828-2667 for the most current load management information.

If you are interested in enrolling in the irrigation load management program, all you have to do is fill out the application, which is available in your district office, for each meter which you are currently recieving the irrigation rate and return it to your District Office before April 1. If you have any questions please call your local District Office.